So, as if me being pregnant with our 4th baby and Travis working 10-14 hour days at work wasn't enough, we are doing a few home improvements around here.
We hired someone to re-side our house, but we had to remove the old siding. Travis is redoing the garage roof and he will be re-siding that, I ripped the old carpet out of Ryan's room and am hoping to refinish the wood floor in there, if I can convince Travis. Oh ya, and we are doing some stuff in our kitchen, so after almost 7 years here we are finally going to do something.
Here are some pictures of the kitchen, so far...
Here is what we started with
This is all of our counter and cupboard space in the kitchen
so, Travis had to remove the old cupboards, the top ones for now anyway.
and he took out both windows
he framed in and installed a bigger one above the sink(his first ever, yah Travis)and is working on covering up the hole where the other one was...
to be continued...and I got a espresso machine that I love ( I know I shouldn't love things but I can't help it)